Every number our calculators show comes from the sources below. Values are checked against the sources listed. Materials vary, so every value is editable in the calculator. Confirm final quantities with your supplier.

Last updated:

Core formulas

All volume tools share the same geometry, done in feet and converted at the end:

  • Volume (cu ft) = area (sq ft) × depth (ft)
  • Cubic yards = cubic feet ÷ 27 (a cubic yard is 3 × 3 × 3 ft)
  • Cubic meters = cubic yards × 0.764555
  • Tons = cubic yards × material density
  • Bags = volume (cu ft) ÷ bag size, rounded up
  • Feet + inches → decimal feet = feet + inches ÷ 12

Material densities (tons per cubic yard)

Nominal dry, loose values aggregated from landscape-supply yards and USDA/engineering references. Bulk density changes with moisture and material; confirm tonnage with your supplier. Checked October 8, 2026.

Material densities in tons per cubic yard
MaterialTons / cu yd
Gravel1.4
Crushed stone1.4
Sand1.35
Topsoil1.1
Mulch0.3
Concrete (wet)2
River rock1.35
Crusher run / road base1.5
Decomposed granite1.3
Compost0.6
Riprap1.5

Sources: Inch Calculator; Inch Calculator; Cubic Yard Estimator . Accessed October 8, 2026.

Bag sizes (cubic feet per bag)

Bag sizes in cubic feet per bag
MaterialCu ft / bag
Mulch2
Gravel / sand0.5
Soil (40 lb)0.75
Soil (large)1
Compost1

Concrete bag yields

Mixed-concrete yield per bag, per the manufacturer data sheet (Quikrete). Checked October 8, 2026.

Concrete bag yields in cubic feet
BagCu ft yieldBags per cu yd
80 lb0.645
60 lb0.4560
40 lb0.390

Sources: QUIKRETE . Accessed October 8, 2026.

Concrete block (CMU)

  • Blocks per sq ft = 144 ÷ (8 × 16) = 1.125 (112.5 per 100 sq ft)
  • Mortar ≈ 12 standard blocks per 80-lb bag (matches Quikrete's Mortar Mix calculator)
  • Core-fill grout per sq ft of fully grouted wall: 6″ = 0.17, 8″ = 0.26, 12″ = 0.42 cu ft (the net core volume; per block = per sq ft ÷ 1.125). A manufacturer core-fill grout confirms about 0.26 cu ft per sq ft for 8-inch block.

Sources: NCMA / Concrete Masonry & Hardscapes Association; TCC Materials (ASTM C476 core-fill grout); QUIKRETE; QUIKRETE . Accessed October 8, 2026.

Concrete footings

Footing concrete uses the same geometry as the slab and column tools: strip = L × W × D, pads = L × W × D × quantity, piers = 3.1416 × (d ÷ 2)² × D × quantity, then ÷ 27 for cubic yards. Footing size and depth (commonly about twice the wall width, at least 12 in wide and 6 in thick, and below the frost line) follow IRC R403.1 and your local code.

Sources: ICC International Residential Code; QUIKRETE . Accessed October 8, 2026.

Rebar for a slab

For a flat-slab grid we count bars each way: bars = floor((span in - 2 × cover) ÷ spacing) + 1, and each run = (run length in - 2 × cover) ÷ 12 feet. Runs that fit one stick are nested (bars per stick = floor(stick ÷ run)); longer runs are spliced, with sticks per run = ceil((run - lap) ÷ (stick - lap)) and the laps added back into the length. Weight = total feet × the bar's weight per foot, using ASTM A615 values (0.376 lb for #3, 0.668 for #4, 1.043 for #5). Defaults are 3 in edge cover (ACI 318 for concrete cast against earth) and a lap of 40 bar diameters. A 20 ft #4 bar runs about $12.75 (2026).

Sources: Concrete Reinforcing Steel Institute (CRSI); Concrete Reinforcing Steel Institute (CRSI); Concrete Reinforcing Steel Institute (CRSI); The Home Depot . Accessed October 8, 2026.

Mulch

Mulch volume uses the shared area and yard math: cu ft = area × depth ÷ 12, then ÷ 27 for cubic yards. One cubic yard covers 324 ÷ depth square feet (108 sq ft at 3 in). Recommended depth is 2 to 4 inches (3 in is a good default), kept a few inches off trunks and stems. A standard bag is 2 cu ft and covers about 8 sq ft at 3 in, so 13.5 bags make a cubic yard. Default prices are 2026 estimates: about $40/cu yd bulk and $4 for a 2 cu ft bag.

Sources: K-State Research and Extension; Vigoro (retail product listing); LawnStarter (2026 cost guide) . Accessed October 8, 2026.

Gravel

Gravel uses the same area and yard math: cu ft = area × depth ÷ 12, then ÷ 27 for cubic yards, and tons = cubic yards × density. Typical crushed stone, #57 and pea gravel weigh about 1.4 tons per cubic yard (2,800 lb); river rock is a little lighter (about 1.35) and crusher run or road base packs heavier (about 1.5). One ton covers (27 ÷ density) ÷ (depth ÷ 12) square feet, so about 77 sq ft at 3 in or 58 sq ft at 4 in for 1.4-ton gravel. For a new driveway, builders commonly lay 4 to 6 inches of crusher run or larger stone as a base, with a couple of inches of #57 or similar on top. The default price is a 2026 estimate of about $45 per ton.

Sources: Cubic Yard Calculator; Gravelshop (aggregate supplier); Gravel Monkey (2026 cost guide) . Accessed October 8, 2026.

Crushed stone by size

The crushed stone page uses the same yard math but sells by quarry size number. Clean, open-graded stone (#57, #3, #8) runs about 1.40 tons per cubic yard, while dense graded stone and fines (crusher run, also sold as #411, and stone dust or screenings) run about 1.50, matching the open-graded vs dense-graded split described by Vulcan Materials and Luck Stone. Coverage per ton is (27 ÷ density) ÷ (depth ÷ 12), so a ton of #57 covers about 58 sq ft at 4 in and crusher run about 54. Truckloads = tons with waste ÷ truck tons, rounded up, with a tandem dump truck holding up to about 14 tons. Prices are 2026 estimates of about $37 to $45 per ton by size.

Sources: Vulcan Materials (quarry); Luck Stone (quarry); Dirt Connections (aggregate supplier); Dirt Connections (aggregate supplier); Dirt Connections (aggregate supplier) . Accessed October 8, 2026.

Sand

Sand uses the same area and yard math: cu ft = area × depth ÷ 12, then ÷ 27 for cubic yards, and tons = cubic yards × density. Dry play, mason or concrete sand weighs about 1.35 tons per cubic yard (2,700 lb, at roughly 100 lb per cubic foot); damp sand holds water in the gaps and runs about 1.5 tons per yard or more. Because 50 lb at 100 lb per cubic foot is half a cubic foot, a 50-lb bag is about 0.5 cu ft, so a ton (about 20 cu ft of dry sand) is close to 40 bags. One ton covers (27 ÷ density) ÷ (depth ÷ 12) square feet, so about 120 sq ft at 2 in or 240 sq ft at 1 in for bedding. Under pavers, the bedding sand is a uniform 1 inch over a compacted gravel base. Default prices are 2026 estimates: about $40 per ton and $6 for a 50-lb bag.

Sources: Harbor Soils (landscape materials supplier); Belgard (paver manufacturer); Yard & Bag (2026 cost guide) . Accessed October 8, 2026.

Brick

Bricks per square foot of wall face come from the Brick Industry Association, using a 3/8 inch mortar joint: a standard modular brick (3.625 × 2.25 × 7.625 in) takes 6.75 per sq ft, queen 5.76, king 4.80 and utility 3.00. For a custom brick, bricks per sq ft = 144 ÷ ((length + joint) × (height + joint)). Multiply by the net wall area (after subtracting doors and windows) and by the number of wythes, then add 5% waste for a plain wall or 10% for lots of cuts. Mortar uses the Quikrete Mortar Mix data sheet: one 80-lb bag lays about 37 standard bricks, so bags = bricks ÷ 37, rounded up. Default prices are 2026 estimates: about $0.70 per modular brick and $7.50 for an 80-lb bag of mortar.

Sources: Brick Industry Association; QUIKRETE; HomeGuide (2026 cost guide) . Accessed October 8, 2026.

Pavers

Pavers per square foot come from the nominal size: pavers per sq ft = 144 ÷ (length × width in inches). A 4 by 8 inch paver takes 4.5 per sq ft, 6 by 6 takes 4, 6 by 9 about 2.67, and a 12 by 12 inch slab is 1 per sq ft. Add about 5% for a running bond, 10% for herringbone and up to 15% for a 45 degree or curved layout. The base and bedding reuse the gravel and sand math: a patio or walkway uses about 4 inches of compacted crusher run (1.5 tons per cubic yard) and 1 inch of bedding sand (1.35 tons per cubic yard, 0.5 cu ft bags), each with about 10% for compaction. Edging is the perimeter of the area. Default prices are 2026 estimates: about $0.65 per 4 by 8 concrete paver.

Sources: Nicolock (paver manufacturer); Belgard (paver manufacturer); HomeGuide (2026 cost guide) . Accessed October 8, 2026.

Paver base

The gravel base reuses the volume and yard math with a compaction allowance: base cu ft = area × depth ÷ 12 × (1 + compaction), then ÷ 27 for cubic yards and × 1.5 for tons of crusher run (1.4 for #57 stone). Loose crushed stone packs down when you compact it, so you order more than the finished volume; we default to about 20%, which sits in the 15 to 20% range for dense-graded crusher run. Base depth follows the install guide: about 4 inches for a walkway or patio, 6 inches on clay or soft soil, and 8 inches for a residential driveway, compacted in lifts no greater than 4 to 6 inches. Bedding sand is 1 inch with 10% extra, in 0.5 cu ft bags. Default prices are 2026 estimates: about $45 per ton bulk, $6 for a 0.5 cu ft base bag, and $6 for a bag of bedding sand.

Sources: Belgard (paver manufacturer); QUIKRETE (HardScapes); Gravel Monkey (2026 cost guide) . Accessed October 8, 2026.

Retaining wall (segmental block)

Blocks per square foot of face come from the block size: 144 ÷ (face height × length in inches), so a 6 by 16 inch block is 1.5 per sq ft, 4 by 12 is 3 and 8 by 18 is 1. For the count we work whole blocks: blocks per course = ceil(length ÷ block length), courses = ceil(height ÷ block height) plus one buried course, and blocks = per course × courses. Makers recommend burying the first course, roughly 1 inch for every 8 inches of height. The base leveling pad is about 24 inches wide and 6 inches deep of crushed stone (with 20% for compaction, 1.5 tons per cubic yard), and drainage stone is about 12 inches wide behind the full wall height in #57 stone (1.4 tons per cubic yard), with a perforated pipe at the base. Walls over about 4 feet measured from the base pad need an engineered design and a permit. Default prices are 2026 estimates: about $4 per block and cap, $1.50 per foot of pipe, and $15 to $35 per square foot installed.

Sources: Pavestone (segmental block maker); Allan Block (segmental block maker); Concrete Masonry & Hardscapes Association (CMHA); HomeGuide (2026 cost guide) . Accessed October 8, 2026.

Fill dirt

Fill dirt uses the shared yard math with a compaction allowance. Cubic feet = area × depth ÷ 12 (a hole is length × width × depth, a round hole is 3.1416 × radius² × depth, and a sloped spot uses the average of the two end depths), then ÷ 27 for cubic yards. Loose fill settles when it is packed, so we add about 20% for compaction, which sits inside the 10 to 25% that common soil shrinks. Typical fill dirt weighs about 1.2 tons per cubic yard (2,400 lb); wet or clay-heavy dirt runs about 1.4 tons. A tandem dump truck carries about 10 cubic yards of dirt (up to 14 by volume), so loads = cubic yards with compaction ÷ load size, rounded up. Default prices are 2026 estimates: about $15 per cubic yard (within $5 to $25) plus a delivery fee.

Sources: Ottr Landscape Supply (bulk soil supplier); HomeGuide (2026 cost guide) . Accessed October 8, 2026.

Landscape rock

Decorative rock uses the shared yard math: cubic feet = area × depth ÷ 12, then ÷ 27 for cubic yards, and tons = cubic yards × density. Bags = cubic feet × (1 + waste) ÷ bag size, rounded up, and the coverage of one ton = (27 ÷ density) ÷ (depth ÷ 12). Rock weight varies a lot by type: river rock about 1.35 tons per cubic yard (2,700 lb, the shared value), heavy Mexican beach pebbles about 1.40 tons (Carroll's Building Materials lists 2,400 to 2,900 lb) and white marble chips about 1.40 tons (Patuxent Nursery lists 2,800 lb), and lightweight, porous lava rock only about 0.55 tons (roughly 900 to 1,300 lb), so a ton of lava rock covers more than twice the area of a ton of river rock. We suggest depth by rock size, about 2 inches for small rock, 3 for medium and 4 for larger rock, and a 0.5 cubic foot bag. Default bulk prices are 2026 estimates, per ton by type: river rock about $80 (within $45 to $130), lava rock about $130 ($80 to $240), pebbles about $500 ($475 to $800) and marble about $700, plus about $7 per 0.5 cubic foot bag.

Sources: Outdoor Warehouse Supply (landscape rock supplier); Carroll's Building Materials (stone & aggregate supplier); Patuxent Nursery (landscape stone supplier); Earth Stone Rock (landscape rock supplier); QUIKRETE (HardScapes); HomeGuide (2026 cost guide) . Accessed October 8, 2026.

Asphalt

Asphalt uses the shared area math, then weight from a unit weight. Cubic feet = area × thickness ÷ 12; tons = cubic feet × density ÷ 2,000; square yards = sq ft ÷ 9; and one ton covers (2,000 ÷ density) ÷ (thickness ÷ 12) square feet. Compacted hot mix asphalt weighs about 145 pounds per cubic foot, which matches the Asphalt Institute rule of thumb of about 110 pounds per square yard per inch of compacted thickness, so a ton covers about 55 square feet at 3 inches. Recycled asphalt millings are lighter, about 120 pounds per cubic foot (PennDOT lists reclaimed asphalt pavement at 120 to 140 lb/ft³, and 100 to 125 compacted). Residential driveways are usually 2 to 3 inches of compacted asphalt over 4 to 8 inches of compacted gravel base. We keep 5% for waste and size truckloads at 20 tons for a tri-axle (loads = tons with waste ÷ truck tons, rounded up). An optional gravel base uses crusher run at 1.5 tons per cubic yard with 20% compaction. Default prices are 2026 estimates: hot mix about $60 per ton (within $40 to $80) and an installed estimate about $8 per square foot (within $5 to $12 for a driveway).

Sources: Asphalt magazine (Asphalt Institute); Illinois Asphalt Pavement Association; Pennsylvania Department of Transportation; Gernatt Asphalt Products; HomeGuide (2026 cost guide); HomeGuide (2026 cost guide) . Accessed October 8, 2026.

Fence post concrete

Concrete for a post fills the hole around it. Concrete depth = hole depth - gravel; the hole volume = 3.1416 × (diameter ÷ 2)² × concrete depth (a round post subtracts 3.1416 × (post diameter ÷ 2)² × depth, a square post subtracts width × length × depth), all in cubic inches, divided by 1,728 for cubic feet per post. Bags = total cubic feet × (1 + waste) ÷ bag yield, rounded up. Fast-setting mix yields about 0.375 cu ft per 50 lb bag and sets in 20 to 40 minutes; the 80, 60 and 40 lb regular bags yield 0.60, 0.45 and 0.30 cu ft. For sizing a hole we use the common rule of about 3 times the post width across, and a depth of about one third of the post's total length plus 6 inches of gravel for drainage. Go below the local frost line where code requires it.

Sources: QUIKRETE; QUIKRETE; QUIKRETE . Accessed October 8, 2026.

Sod

Sod uses the shared area math. Net area = sum of the areas minus any cut-outs; order = net × (1 + waste); pallets = net-with-waste ÷ pallet coverage, rounded up; and pieces = net-with-waste ÷ piece area, rounded up, where a 16 by 24 inch slab is 2.67 sq ft and a 2 by 5 ft roll is 10 sq ft. We default to 5% waste (extension guides suggest about 5%, up to 10% for curvy yards) and a 450 sq ft pallet, though pallet coverage runs about 400 to 500 sq ft and varies by farm. Default prices are 2026 estimates: about $0.50 per sq ft for the grass (within $0.30 to $0.80) and an installed estimate about $1.50 per sq ft (within $1 to $2).

Sources: The Grass Outlet (sod farm); CT Sod (sod farm); Mississippi State University Extension; HomeGuide (2026 cost guide) . Accessed October 8, 2026.

Grass seed

Seed uses the same area math (acres convert at 43,560 sq ft). Pounds = area ÷ 1,000 × the seeding rate for your grass; bags = pounds ÷ bag size, rounded up; and leftover = bags × bag size - pounds. Rates are pounds per 1,000 sq ft for a new lawn, with overseeding at about half that. Each default is the midpoint of the cited extension range. New-lawn ranges: Kentucky bluegrass 2 to 3, turf-type tall fescue 6 to 8, perennial ryegrass and fine fescue 4 to 5, hulled bermudagrass 1 to 2, zoysiagrass 1 to 3, centipedegrass 0.25 to 1, and bahiagrass 3 to 8. Seed is sold in 3, 7, 20 and 40 lb bags, and a 20 lb bag of tall fescue runs about $67 (2026). If your seed bag lists its own rate, use the custom setting.

Sources: Penn State Extension; NC State Extension; University of Georgia Extension; Scotts . Accessed October 8, 2026.

Acres per hour & field efficiency

Acres per hour = (width in inches × mph × efficiency) ÷ 99 (equivalently width ft × mph × efficiency ÷ 8.25). The constant converts 5,280 ft/mile and 43,560 sq ft/acre. Efficiency presets follow ASABE field-efficiency ranges:

Mower field-efficiency presets
EquipmentEfficiency
Zero-turn mower (80–85%)82%
Push mower (70–80%)75%
Tractor + implement (70–85%)78%
Bush hog / rotary cutter (75–85%)80%
Sprayer (50–80%)65%

Sources: ASABE (ANSI preview); Iowa State University Extension . Accessed October 8, 2026.

Gutter slope

Drop (in) = (run length ÷ 10) × slope per 10 ft. Presets follow manufacturer install guides:

Gutter slope presets
PresetInches per 10 ft
¼" per 10 ft (minimum)0.25
½" per 10 ft0.5
¼" per foot (fast drainage)2.5

Sources: PNNL Building America Solution Center; Englert . Accessed October 8, 2026.

Riprap stone classes

Representative gradations and layer thicknesses, per FHWA HEC-11 and NCHRP 568; your state DOT tables govern.

Riprap stone classes
ClassD50 sizeLayer thickness
Light / Class I4–6 in12"
Medium / Class II9–12 in18"
Heavy / Class III15–18 in27"

Sources: US Federal Highway Administration; Transportation Research Board . Accessed October 8, 2026.

Rounding & waste

Results are rounded for display (usually to two decimals); counts of bags, blocks and bars are always rounded up so you don't come up short. Default waste allowances: yardage 5%, concrete slab 10%, block 5%, carpet 10%. You can change the waste percentage on every tool.

Concrete slab installed cost

The slab calculator can show a materials-only (DIY) total or an installed total with labor. A finished slab runs about $6 to $12 per square foot installed, averaging around $8. We default labor to $4 per square foot, the midpoint of a 2026 placing-and-finishing range of $3 to $5, and welded wire mesh to about $0.35 per square foot for a basic slab. By project the installed range is about $4 to $12 per sq ft for a basic patio or walkway, $6 to $15 for a driveway, $6 to $12 for a garage floor and $8 to $19 for stamped or colored concrete. Local prices vary a lot, so get two or three quotes.

Sources: HomeGuide (2026 cost guide); HomeGuide (2026 cost guide) . Accessed October 8, 2026.

Prices

All prices are editable 2026 national-average estimates for planning, not quotes. The default ready-mix price (~$160/cu yd) and lawn-mowing tiers sit within the ranges in the 2026 cost guides below; confirm with a local supplier. See the disclaimer.

Sources: SlabCalc (2026 cost guide); LawnStarter (2026 cost guide) . Accessed October 8, 2026.